         Sector Case Studies - Commercial and Retail

37 ESPLANADE, ST HELIER, JERSEY

 

The piling for this commercial development was designed and installed by Amplus Ltd for Dandara Ltd 2010.

390 450/600 CFA piles were installed for the foundations of secant and contiguous piles.

Amplus completed the works in 2010.


   

44 ESPLANADE, ST HELIER, JERSEY

 

 

 

 

 

44 Esplanade fronts both the Esplanade and Seaton Place and will be Jersey's largest single occupancy commercial building, comprising just over 9,000 m2 over 6 floors and a basement and will be large enough to accomodate 600 staff under one roof.

 

Designed by Naish Waddington for JCN Investments, it is BREEAM rated.  The value of the building is £14million.

 

Piling was designed and installed by Amplus for main contractor Camerons Ltd  using two Casagrande piling rigs.

 

Some 520nr secant wall piles comprising of 600mm and 450mm nominal diameter CFA  piles to an average depth of 11m created a 220m long embedded pile wall for the single storey basement.

 

Amplus bored 122nr x CFA foundation piles comprising of 600mm and 450mm nominal diameter piles to an average depth of 12m  to carry compressive forces of up to 1500kN.

 

Amplus completed the works ahead of schedule in 2008.

back to top

RADISSON HOTEL, WATERFRONT

 

The 195 room Radisson SAS Waterfront Hotel,  Jersey opened 2007  is constructed close to the popular waterfront promenade and within close proximity of the financial district and town centre. 

The site was reclaimed from the sea about 10 years ago. Amplus designed and installed the piles. The six storey hotel is supported on nearly 300nr driven pre-cast concrete piles. The 275mm square piles were manufactured in England using a concrete mix DS-3 suitable for the harsh ground conditions. The 11m - 13m long piles were shipped to Jersey and driven in with a Junttan PM16 crawler mounted rig and a 3 tonne hammer to a safe working load of 750kN.

In addition, Amplus drilled 30nr mini-piles successfully  through the rubble sea wall abuttung the site. The 250mm diameter permanently cased piles were installed using a TD610 rig and rotary percussive pneumatic drilling methods.

Amplus completed the piling on programme in 27 days in 2006.

back to top

 

LIBERATION PLACE - TOURISM

 

Piling was designed and installed by Amplus for Camerons for this retail development.

80 350mm CFA piles were installed for the foundations.

The works were completed by Amplus in 2006.

 

26 ESPLANADE, ST HELIER

This new landmark office development, located on a vacant site at the entrance to St Helier town centre, was designed by Axis Mason for Dandara and forms part of a major pedestrian route from the existing retail precinct to the emerging central business district on the Esplanade. 


The six storey building is occupied by AIB, JFSC and Capita Fiduciary. There is a full size single storey basement for car parking. 

Amplus designed and installed an embedded pile wall around the 1400m2 basement and the internal foundation piles using combination of CFA and cased bored cast-insitu piling. The piling was carried out using a Casagrande CFA 425 and two Bauer MBG12 piling rigs. 

 

Amplus designed a cantilever contiguous pile wall constructed of 183nr 450mm diameter CFA piles at 600mm spacings. The 11m long piles were designed by Amplus to carry compressive forces of 550kN as well as lateral loads from earth pressures and surcharges. Along another  length of the site adjacent to an old settlement sensitive warehouse, Amplus designed and built a propped hard/soft secant pile wall of 79nr 620mm diameter piles with reinforced structural piles at 940mm centres.

Amplus designed and installed 117nr CFA internal foundation piles of 450mm and 600mm diameter to carry compressive loads of upto 1850kN and tensile loads of up to 150kN.

Amplus completed the piling in 33 days in 2006.

11 - 12 ESPLANADE

Piling was designed and installed  by Amplus Ltd for Dandara Ltd for this commercial development.

307 350-620 CFA/cased bored piles were installed for the foundations and secant 620 & contiguous 450/350 wall piles.

Amplus completed the works in 2006.

 

LIBERATION PLACE BUS STATION

Piling was designed and installed by Amplus Ltd for Camerons for this transportation development.

275 350-250 CFA/ODS piles were installed for the foundations

Amplus completed the works in 2006

 

HAWKSFORD HOUSE, 15 ESPLANADE, ST HELIER

Amplus designed and installed the piles for Falles Ltd for this commercial development.

149 450 CFA piles were installed for the foundations and contiguous wall piles.

Amplus completed the works in 2005

 

back to top

APPLEBY

Appelby, formerly Bailhache Labesse, one of Jersey’s largest legal firms, relocated to a new purpose-built office on the prestigious Esplanade, St.Helier. The interior was designed by Axis Mason for Dandara with a central  atrium that successfully links the four-storey space giving much needed natural light to the centre of the narrow floor plates. 


                  
 

There is a full size single storey basement for car parking

Amplus designed and installed an embedded pile wall around the  basement and the internal foundation piles using  CFA piling. The piling was carried out using a Casagrande CFA 425 rig. 

Amplus designed a cantilever  hard/soft secant pile wall constructed of 314nr 450mm diameter CFA piles with reinforced structural piles at 600mm centres. The 11m long piles were designed by Amplus to carry compressive forces of 500kN as lateral loads from earth pressures and surcharges.  

Amplus designed and installed 88nr CFA internal foundation piles of 450mm diameter to carry compressive loads of up to 680kN.

Amplus completed the piling in 11 weeks using one rig in 2003.

back to top

SG HAMBROS, 18 ESPLANADE, ST HELIER

Piling was designed and installed by Amplus Ltd for Premier fort his commercial development.

381, 450mm CFA piles were installed for the foundations and secant wall piles.

Amplus completed the works in 2002

 

CENTURY BUILDINGS, 58-59 ESPLANADE, ST HELIER

Piling was designed and installed by Amplus for Dandara for this commercial and residential development.

444, 450mm CFA piles were installed for the foundations and secant wall piles.

Amplus completed the works in 2002

 

WATERFRONT LEISURE COMPLEX

Ampus designed and installed the piles for Cameron - Sir Robert McAlpine for this leisure development

771 250mm ODS piles were installed for the foundations.

Amplus completed the works in 2002.

 

ALBERT QUAY HOUSING

Piling was designed and installed by Amplus Ltd for Cameron - spie Batignolles for this residential development.

1403 250mm ODS piles were installed for the foundations.

Amplus completed the works in 2001.

 

C5 ALLIANCE, 22 ESPLANADE, ST HELIER

Piling was designed and installed by Amplus Ltd for Anvil Projects for this commercial development.

40 250mm ODS piles were installed for the foundations.

Amplus completed the works in 2000.

 

JUBILEE WHARF, 24 ESPLANADE, ST HELIER

 

Piling was designed and installed by amplus for Dandara for this commercial development.

43 250mm ODS piles were installed for the foundations.

Amplus completed the works in 2000.

 

KINGSGATE, 55 ESPLANADE, ST HELIER

Piling was designed and installed by Amplus for Stansell for this commercial development.

315 450mm CFA piles were installed for the foundations and secant wall piles.

Amplus completed the works in 1999

CAREY OLSEN, 45-47 ESPLANADE, ST HELIER

Piling was designed and installed by Amplus for Stansell for this commercial development.

294 450mm CFA piles were installed for the foundations and contiguous wall piles.

Amplus completed the works in 1997.

 